
Municipal
Hillsborough Heights PUD
For this project Caladesi added electrical lights and fans to a pre-existing metal building for workers to accept dropped off electronic recycling items.
The Project
This Design/Build project consisted of a 4100 square foot office and 1645 square foot vehicle maintenance facility. The office is an air conditioned pre-engineered metal building with a metal roof, exterior structural metal studs and hardieplank lap siding. Both facilities are pre-engineered metal buildings with metal roofs and hard plank siding.
Start the conversation
From planning through construction, let's talk about how Caladesi can bring your vision full circle.
Start building with usPrefer the phone? (727) 585-9945