
Commercial / Industrial
Belleair Country Club 1897 Men’s Lounge
This was a complete demolition of the existing men’s lounge and expansion into the old locker room area.
The Project
Formulated Solutions is one of many of our repeat clients that has trusted us with their Design/Build needs. This 19,520 square foot pre-engineered project encompassed three pre-engineered buildings integrated between two existing buildings. Site and drainage modifications were made to the site as well.
Start the conversation
From planning through construction, let's talk about how Caladesi can bring your vision full circle.
Start building with usPrefer the phone? (727) 585-9945