
Commercial / Industrial
Belleair Country Club 1897 Men’s Lounge
This was a complete demolition of the existing men’s lounge and expansion into the old locker room area.
The Project
Caladesi Construction provided a new 24,500 square foot Factory Mutual compliant / climate controlled manufacturing facility which included: Complete site development, utility installations, with associated parking areas, Butler Pre-Engineered metal Building, plumbing, compressed air/water for equipment, heating, air conditioning, electrical and fire alarm system.
Start the conversation
From planning through construction, let's talk about how Caladesi can bring your vision full circle.
Start building with usPrefer the phone? (727) 585-9945